Project Background
In 2025, a polytechnic institution in Alberta was expanding its technical training facilities to better serve up-and-coming trades and power engineering students.
The college needed a new air compressor system that would supply compressed air for various training aids and also serve as a training tool itself.
The Challenge
Chamco was responsible for supplying, installing, and piping a complete air compressor package for the college’s expanded workshop facilities.
Why the Polytechnic Institution Chose Chamco
The polytechnic institution selected Chamco based on our ability to provide both reliable equipment supply and professional installation services, which is exactly what was needed for a system that would serve as a training reference for future tradespeople.
The Solution
Chamco worked closely with the technical college to deliver a complete turnkey air compressor system that exceeded expectations and addressed each challenge.
The Results

Chamco provided a comprehensive system that included two ST1112R Sullair compressors, two A10049 dry air receivers, two NDL080 GF NANO dryers, and one SEP 120ST nano oil water separator.
The completed system now supplies compressed air for various training aids while serving as a hands-on teaching tool for trades and power engineering students.

“It was a straightforward project, but the real success came from our team working efficiently to meet deadlines and follow the customer’s specifications exactly.”
Other Case Studies
How Chamco Delivered a Turnkey Compressed Air Solution to Enhance Reliability and Efficiency For an Alberta Sawmill
chamco2025-08-21T09:58:37-06:00In 2023, a major sawmill in Alberta needed to upgrade its aging compressed air system and turned to Chamco for a reliable, turnkey solution.
How Chamco Helped Two Oil & Gas Companies Protect Their Assets for Nearly Half the Cost of Traditional Foam Systems
chamco2025-05-05T06:31:42-06:00In 2024, two major North American oil & gas companies needed to install fire foam protection systems for various new sites across Western Canada.
How Chamco Helped a General Contractor Design and Install a Floating Pump System For a Municipal Customer
chamco2024-09-20T13:01:33-06:00In 2021, a municipality planned to install a floating pump system to feed the new water intake for a water treatment plant. For these municipal services, they required an open deck-style floating pump system that would not interfere with recreational activities or local wildlife.