Project Background
In 2025, a polytechnic institution in Alberta was expanding its technical training facilities to better serve up-and-coming trades and power engineering students.
The college needed a new air compressor system that would supply compressed air for various training aids and also serve as a training tool itself.
The Challenge
Chamco was responsible for supplying, installing, and piping a complete air compressor package for the college’s expanded workshop facilities.
Why the Polytechnic Institution Chose Chamco
The polytechnic institution selected Chamco based on our ability to provide both reliable equipment supply and professional installation services, which is exactly what was needed for a system that would serve as a training reference for future tradespeople.
The Solution
Chamco worked closely with the technical college to deliver a complete turnkey air compressor system that exceeded expectations and addressed each challenge.
The Results

Chamco provided a comprehensive system that included two ST1112R Sullair compressors, two A10049 dry air receivers, two NDL080 GF NANO dryers, and one SEP 120ST nano oil water separator.
The completed system now supplies compressed air for various training aids while serving as a hands-on teaching tool for trades and power engineering students.

“It was a straightforward project, but the real success came from our team working efficiently to meet deadlines and follow the customer’s specifications exactly.”
Other Case Studies
How Chamco Built the “Cadillac” of Fire Pump Packages for a B.C. Natural Gas Facility
chamco2026-06-17T13:37:31-06:00A liquefied natural gas facility on the B.C. coast became Chamco’s largest and most complicated fire pump package to date. The site required 10,000 GPM of suppression capacity, strict human factor engineering standards, and zero tolerance for risk.
How Chamco Successfully Relocated a Barge at a Remote Mongolia Mine
chamco2025-11-06T08:55:43-07:00In 2023, a major mining company needed to relocate a Chamco-built floating pump house from one tailings pond to a newly constructed second pond. The customer required the barge to be moved fully intact on a strict timeline.
How Chamco Delivered a Functional Showcase Air Compressor System for a Technical Training Facility
chamco2025-10-28T11:21:38-06:00In 2025, a technical training facility in Alberta expanded its workshop and required a new air compressor system. Chamco was tasked with supplying, installing, and piping the system on a tight one-week schedule while meeting strict building specifications.