CASE STUDY
How Chamco Delivered a Turnkey Compressed Air Solution to Enhance Reliability and Efficiency For an Alberta Sawmill

Project Background
In 2023, a major sawmill in Alberta needed to upgrade their aging compressed air system to meet growing operational demands. The facility was experiencing reliability issues with its existing equipment and required an increased air capacity to maintain efficient operations.
As a trusted equipment supplier and service provider with over 20 years of history at the site, Chamco was approached to design and deliver a comprehensive compressed air solution that would enhance both reliability and energy efficiency.
The Challenge

There were several unique challenges for upgrading the sawmill’s compressed air system.
Why the Sawmill Chose Chamco

The sawmill selected Chamco based on several key factors that differentiated us from competitors. With over two decades of successful partnership, Chamco had established itself as a reliable equipment supplier and service provider for the site, creating a foundation of trust and proven performance.
Plus, unlike competitors who would have required multiple contractors and suppliers, Chamco offered complete project management from equipment supply through engineering, installation, and commissioning, providing a single point of contact throughout the entire project. This full turnkey capability eliminated the complexity of managing multiple vendor relationships and potential coordination issues between different suppliers.
Additionally, Chamco’s proposed Sullair compressor system offered significantly better energy efficiency compared to both the existing equipment and competitive alternatives, delivering long-term operational cost savings that would benefit the facility for years to come.
Finally, Chamco’s ability to handle all regulatory requirements, including Alberta Boilers and Safety Association (ABSA) registration and compliance, eliminated complexity for the customer and ensured seamless project execution.
The Solution

Chamco implemented a phased approach to deliver a comprehensive compressed air system upgrade that addressed all of the sawmill’s challenges.
The Results

Our compressed air system upgrade delivered significant improvements in reliability, efficiency, and operational performance for the sawmill.
This successful project reinforced Chamco’s position as the customer’s trusted partner for critical industrial infrastructure upgrades.

“We provided full support the whole way through. The customer didn’t need to go to multiple contact points; they could just come to us with any challenges or concerns, and we worked it through with them.”
Other Case Studies
How Chamco Built the “Cadillac” of Fire Pump Packages for a B.C. Natural Gas Facility
chamco2026-06-17T13:37:31-06:00A liquefied natural gas facility on the B.C. coast became Chamco’s largest and most complicated fire pump package to date. The site required 10,000 GPM of suppression capacity, strict human factor engineering standards, and zero tolerance for risk.
How Chamco Successfully Relocated a Barge at a Remote Mongolia Mine
chamco2025-11-06T08:55:43-07:00In 2023, a major mining company needed to relocate a Chamco-built floating pump house from one tailings pond to a newly constructed second pond. The customer required the barge to be moved fully intact on a strict timeline.
How Chamco Delivered a Functional Showcase Air Compressor System for a Technical Training Facility
chamco2025-10-28T11:21:38-06:00In 2025, a technical training facility in Alberta expanded its workshop and required a new air compressor system. Chamco was tasked with supplying, installing, and piping the system on a tight one-week schedule while meeting strict building specifications.