How Chamco Custom Engineered a Brine Pumping Barge for a Saskatchewan Potash Mine

Floating brine pumping barge with an enclosed pump house moored in a potash mine’s pond, connected to shore by a stainless steel pipeline and steel walkway, with snow on the surrounding prairie.

Project Background

A global mining company needed a dependable way to pump brine at its potash mine in Saskatchewan. Brine is a byproduct of potash production that the mine can pump back into its operations and reuse, but it is one of the hardest products in the industry to move. Potash operations have tried shore-based units, submersible pumps, and other floating designs to handle it, with limited success.

Chamco’s involvement in the project dates back over a decade, to when they completed the original design before the project was ultimately shelved. Potash prices had dropped, the mine was still in its early stages, and it wasn’t ready to pump brine yet.

In 2020, the customer revived the project with a new engineering, procurement, and construction (EPC) firm. Chamco was awarded the engineering phase in 2021 and the procurement and fabrication phase a little over a year later. The scope covered a complete floating pump station, including four super duplex stainless steel vertical turbine pumps, stainless steel header piping, a walkway, shore-to-barge piping, a mooring system, and the barge’s overhead crane system. Chamco designed and fabricated the barge in its Calgary shop, and the customer shipped it to the site for field assembly.

The Challenges

Stainless steel header piping and an electrically actuated valve lifted into place on the barge deck, beside the mounting plates for the vertical turbine pumps, in Chamco’s fabrication shop.

Requests to pump brine don’t come along often. At this mine, every part of the barge, from the pumps to the paint, had to be designed around the difficulties of working with brine, the site, and a demanding set of customer specifications.

  • A Thick, Corrosive Product

    The brine at this mine is thick, with a consistency closer to wet sand than water. When it stops moving, it crystallizes and hardens on whatever it touches, including the barge’s hull, the piping, and the inside of the pumps, so a system that couldn’t clear its own buildup would eventually clog. Brine is also extremely corrosive. Carbon steel and standard stainless steel pumps don’t always hold up well; other potash mines have found that standard coatings don’t last, and on this barge, even a small nick in the hull coating could lead to corrosion almost overnight.

  • Extreme Environmental Conditions

    The site experiences temperatures ranging from -50°C to +40°C, a 90 °C swing, along with heavy snow and high wind loads. Every component on the barge, inside the building and out, had to be designed to withstand the full range of environmental extremes.

  • Keeping a Floating Barge Stable

    On a barge, every design decision affects stability. Building height, equipment weight, and snow on the roof all shift the centre of gravity, and moving a 20,000-pound motor across the deck changes how the barge sits in the water. On a skid project, a design change is fine as long as it stays within the footprint. Here, the same change could compromise stability.

  • Remote Operation

    The customer planned to operate the barge from a control room, roughly two hours away from the site. On most sites, an operator can walk from the control room to the equipment in a few minutes. Here, the barge needed to report on its own condition and give operators early warning if anything went wrong.

  • Heavily Spec-Driven Requirements

    The customer runs a design program focused on human factors engineering and safety, supported by an early-prevention program to target issues before they arise. Any improvement over the specification is logged and reviewed so it can be applied to future projects, and every contractor on site takes part. The specifications covered everything from equipment access to which materials were allowed on the barge. The customer expected a product engineered to those specs, not a standard offering with exceptions.

Why The Customer Chose Chamco

Fabricator setting an electrically actuated valve between stainless steel header pipe spools during barge assembly in Chamco’s Calgary shop.

When the Request for Quotation (RFQ) was issued, it included a design that the EPC firm had developed with another vendor during budgeting. This design included several modules that connected to a common header.

Chamco had concerns about how a modular layout would perform in a cold climate with a product that doesn’t move easily and raised them directly with the EPC firm. Afterward, Chamco was asked to quote its own design: a single, integrated barge.

Following further discussions, the customer and EPC firm agreed with Chamco’s assessment and selected our design. Chamco’s experience with barges and brine, and our ability to back up its engineering concerns, made the case.

Chamco’s in-house capability was another selling feature. Engineering and fabrication would happen in one building, close to site, with a single point of contact for the entire project.

The Solution

Four stainless steel vertical turbine pumps wrapped in protective plastic on wooden cradles in Chamco’s Calgary shop, ready for shipment to a potash mine.

Chamco delivered a complete design for the barge and everything on it. Four super duplex vertical turbine pumps provide two duty pumps and two installed spares, so operators can take pumps offline for flushing, maintenance, or repairs while the barge keeps running 24/7, 365 days a year. Chamco also designed the header piping, walkway, shore-to-barge piping, and mooring system, with our scope ending where the walkway, piping, and cables reach shore.

  • A Hot-Water Flush System

    To deal with crystallization, Chamco built a hot-water flush line into the barge. Operators can run hot water back down the pipelines and into the pumps to dissolve brine buildup and clear it out. Periodic hot-water wash-downs keep the rest of the barge clear.

  • Super Duplex and Stainless Steel

    The pumps are made from super duplex stainless steel, a highly corrosion-resistant material that falls outside a standard pump offering. Chamco worked with the pump supplier to design custom pumps to the required material specification. The piping and valves are stainless steel, and the on-barge cables use stainless steel fittings for the same reason.

  • Specialized Coatings

    A specialized hull coating prevents brine from adhering and protects the underlying steel. Because a single nick could start corrosion, application was tightly controlled. A NACE Level 2 coatings inspector tested dry film thickness across the barge, and joints were rounded so the coating couldn’t pull back from sharp edges.

  • Custom Motors

    Chamco worked with several motor vendors to build custom motors, but ultimately selection was based on minimizing impacts to the centre of gravity on the barge. Even though the motors are inside a building, their fans are made of a special material, and their coatings have been upgraded to resist corrosion. The building’s louvres were also upgraded to stainless steel.

  • Stability-Driven Layout

    The building height was set by the required height of the overhead crane, which needs enough clearance under the hook to lift the motor, the tallest component, before pulling the pump out in pieces. Chamco calculated the barge’s stability and ballast to ensure it remains level under snow loads and when heavy components are moved across the deck.

  • A Smart Barge for Remote Operation

    Chamco equipped the barge with extensive instrumentation so operators can monitor it in real time without anyone standing on it. Inclinometers send an alert if the barge tilts or moves, and the hull is monitored for freeboard. Signals travel over cellular and radio links, so every instrument had to withstand corrosive conditions and communicate reliably over long distances in all weather conditions.

The Results

Floating brine pumping barge connected to shore by a steel truss walkway and stainless steel discharge pipe, with concrete blocks supporting the cable tray and a black pipeline running across the snowy shoreline.

Chamco delivered the barge on time and on budget. Schedule was a major concern for the customer, who assigned a dedicated expediter to follow the project from start to finish. The design went through multiple iterations and scope additions along the way. Even so, the finished barge met all of the customer’s expectations, and Chamco sent its crew to commission the pumps once the barge was assembled on site.

Chamco’s in-house setup kept the project moving. Engineering and fabrication were handled under one roof, with a single project manager serving as the customer’s point of contact.

With so much happening across the mine site, weekly meetings with Chamco stayed quick and positive. The customer told Chamco it was the easiest vendor to deal with, and since the installation, it has returned for additional equipment.

Quotation Mark

“This was an extremely challenging project from a lot of perspectives, and it was delivered on time, on budget, and met all of the customer’s expectations. It was a positive, collaborative project the whole way through, and we had a good relationship with the customer from start to finish.”

Erin Perkins, Project Manager